Sep 03, Kathmandu - Nepali Army and Armed Police teams have advanced approximately 10 meters inside the tunnel, overcoming existing obstacles at the Trishuli-3 ‘A’ Hydropower Project in Rasuwa.
According to Engineer Shri Ram Neupane, the teams are currently removing rocks and other barriers using excavators and blasting techniques.
Thanks to continuous efforts, rescue and construction teams have now reached close to the ground level of the tunnel, marking a crucial step in the project’s progress.
Indian Rupee
U.S. Dollar
European Euro
UK Pound Sterling
Swiss Franc
Australian Dollar
Canadian Dollar
Singapore Dollar
Japanese Yen
Chinese Yuan
Saudi Arabian Riyal
Qatari Riyal
Thai Baht
UAE Dirham
Malaysian Ringgit
South Korean Won
Swedish Kroner
Danish Kroner
Hong Kong Dollar
Kuwaity Dinar
Bahrain Dinar